Intertenancy Walls Explained: What Goes Into a Separating Wall

Building a duplex, terrace or townhouse? The wall between the two homes is the most regulated wall on the job. It has to hold back a fire for an hour and keep the neighbour's TV out of your bedroom, and it only does both if every layer goes in exactly as tested.
Short answer: under the National Construction Code, a separating wall between two Class 1 homes needs a fire-resistance level of 60/60/60 and an airborne sound rating of Rw + Ctr 50 or better. Lightweight systems get there with a shaftliner core, a timber or steel frame each side, fire-rated plasterboard and insulation, all from one tested system.
Key takeaways
- ✔ A separating (intertenancy) wall sits between two attached homes, such as a duplex, terrace or townhouse.
- ✔ Fire: the NCC Housing Provisions call for an FRL of not less than 60/60/60.
- ✔ Sound: the wall must reach Rw + Ctr of at least 50, and the wall must also resist impact sound.
- ✔ Both ratings belong to the tested system as a whole. Mixing parts can void them.
- ✔ Your certifier signs it off, so get the system named on the plans before you order.
What the numbers mean
FRL 60/60/60 is three ratings in minutes: structural adequacy, integrity (no flames or hot gases getting through) and insulation (the far side stays cool enough). A separating wall must hold all three for 60 minutes.
Rw + Ctr measures how well a wall blocks airborne sound. Rw is the base rating; Ctr adjusts it for low-frequency noise such as bass and traffic. The higher the number, the quieter the home next door. The NCC also requires the wall to continue to the underside of the roof, or to a ceiling that gives the same insulation, so sound and fire can't go over the top.
The typical lightweight build-up
- Shaftliner panels in the centre of the wall, held in steel tracks and studs. We stock 25 mm Shaftliner Mouldstop panels.
- Two separate frames, one for each home, standing either side of the shaftliner with a gap so the frames don't touch. That gap is what stops impact sound travelling through.
- Insulation in the frame cavities, as the system specifies.
- Fire-rated plasterboard on the room side of each frame. We stock 16 mm fire-rated plasterboard.
- The right fixings for each layer: laminating screws for board to board, plasterboard screws for board to frame, and the system's clips and H studs.

Follow the system, not a mix
The fire and acoustic ratings come from a full-size test of the whole wall: panels, studs, board, insulation, fixings and spacing together. Change one part and you no longer have the tested wall. Use one maker's system, keep its installation guide on site, and don't mix components from different systems without your certifier's written okay.
| Requirement | What the NCC asks | What it means on site |
|---|---|---|
| Fire | FRL not less than 60/60/60 | Tested system, fire-rated board, sealed penetrations |
| Airborne sound | Rw + Ctr not less than 50 | Correct board layers, insulation and cavity |
| Impact sound | Discontinuous construction | Two frames that don't touch each other |
| Height | To the underside of the roof, or a rated ceiling | No gaps in the roof space |
| Services | Penetrations protected to keep the rating | Use the system's tested details for pipes and cables |
Planning your order
- Get the system name and installation guide from your plans or certifier.
- Measure the length and full height of each separating wall, up to the roof.
- Count shaftliner panels, tracks and H studs at the system's spacing.
- Count plasterboard for both sides, by layer if the system calls for two layers.
- Add insulation, the screws for each layer, and the system's sealants for penetrations.
- Add 5 to 10% for cuts and breakage on board.
Frequently asked questions
Can I just use two layers of fire-rated plasterboard on one frame?
Not unless that exact build-up is a tested system that reaches the FRL and sound ratings. Two separate frames are what most lightweight systems rely on for impact sound.
Is a brick wall an option?
Yes, masonry separating walls are common too. This guide covers lightweight systems, which are lighter and faster to stand on a slab.
Do the rules change in apartments?
Apartments are Class 2 buildings and follow NCC Volume One, which has its own requirements. Ask your certifier.
Who signs off the wall?
Your certifier, usually with a component certificate or installer statement. Keep the system documents and photos of each stage.
Get the whole wall priced
Browse our intertenancy range and GTEK parts, or send us your plans and we'll quote the full wall, frame timber included. Request a quote or call 02 4605 0215. For the frames either side, see H2, H3 or H4 treated pine.
General information as at November 2026, based on the NCC 2022 Housing Provisions. NSW moves to NCC 2025 on 1 May 2027. Your plans and certifier set the requirements.
Sources: ABCB, NCC 2022 Housing Provisions Part 9.3; ABCB, NCC 2022 Housing Provisions Part 10.7.